
Add to Cart
Aluminium Transformer Conductor 6063 Flange Parts For Power Industry
Products Application:
1. High voltage bushings,
2. GIS (Gas Insulated Switchgear),
3. Substation,
4. Current transformer, AC test transformer, voltage transformer, etc,
5. Power cable (accessory),
6. High voltage laboratory (High voltage test equipment).
Quick Detail:
Quality Control:
1) Checking the raw material after they reach our factory. Incoming quality control(IQC)
2) Check the details before the production line operated
3) Full inspection and routing inspection during mass production. In process quality control(IPQC)
4) Checking the goods after finished. Final quality control(FQC)
5) Checking the goods before shipment. Outgoing quality control(OQC)
Advantages:
1. Widely used for high voltage test
2. High strengh
3. Excellent silvery bright finish
4. Corona control advantage
5. High moistureproof
6. Tasteless non-poisonous
7. Excellent performance of anti-causticity
8. Competitive price with good quality.
9. Low MOQ (2 pieces is even acceptable in some special conditions).
10. Customized sizes and specifications /OEM available.
11. In Shanghai and Near Ningbo port of China, convenient transportation.
12. Short lead time (7-30 working days according to order quantity).
Why Choose Us:
1. For delivery time, which will be 15-35 days after deposit received.
2. Accept both large and small order quantity, min order quantity 1 piece is workable.
3. Manufacture all size of spinning spare parts products according to customers’ special drawings.
4. Convenient transportation from our factory to Shanghai port.
5. Unique packaging methods by our professional team.
Packaging Details:
MOQ | No limited or small order (2-3 Pieces) is workable |
Price | FOB, CFR, CIF |
Port | Shanghai port |
Payment | L/C, T/T |
Supply Ability | 5000 pcs per month. |
Delivery Time | Within 15-35 Working Days |
Packaging | Paper carton, Wooden box, Steel pallet or Customized |
Shipment | By Air/Sea |
Note:
Products Display And Application:
FAQ:
Q: What’s your MOQ?
A: Our MOQ is 1 piece.
Q: How long it takes to get quotation?
A: We will submit formal quotation with 24 hours after your products information received.
Q: What’s information needed for accurate quotations?
A: We need drawings, quantity and any other specific requirements.
Q: What’s your production time?
A: Generally, we need 5~15 working days for prototype order, but it can be shortened for urgent order.
Q: How to transport my products?
A: If the goods is less than 200kg, we suggest to use express delivery. We have long-term cooperation with FedEx/DHL/UPS and enjoy much discount. If the goods are more than 200kg, we can arrange shipment as per customer’s requirements.